Project Details:

Hot Rolled Steelwork:

24 tonnes

Cold Formed Steelwork:

9 tonnes

Steel Cladding:

2200m²

Concrete Slab:

1800m²

Client:

Drumbow Homes

Main Contractor:

Drumbow Homes

Architect:

Drumbow Homes

Structural Engineer:

Kevin Gunn
(Leslie Plummer Associates)

References:

Alex Clarkson
Drumbow Homes

 

drumbow homes structural steelwork project

Workshop and Offices for Manufacturer of Timber Framed House Kits

BHC completed the foundations; structural steelwork; cladding; concrete floor slab and doors.

This new manufacturing facility allowed Drumbow Homes, a well-known House Builder in North Lanarkshire, to re-locate from their previous site near Caldercruix to a new purpose-built facility in Bathgate.

By tailoring the structure to suit Drumbow's precise requirements, the BHC internal design team re-designed the steel frame to achieve significant savings for the client.